Ready for take-off? BIAL Airport gears up for May 23

So despite all the controversies about keeping our HAL airport open, according to the latest reports and press releases, the BIAL Airport will finally open its doors at the stroke of midnight (00:01 hours of May 23). All flights landing and departing after midnight will operate from the new airport and flights arriving before midnight (on May 22, 2008) and departing after midnight will operate from the new airport.

BIAL Airport

To refresh your memory (in case you haven’t been reading enough of it already!), the new airport is on the National Highway 7 and is 40kms from the city’s central business district.

Meru and EasyCabs are the taxi services which have tied up with the airport. An indicative price from the airport to MG Road is around Rs 600 including waiting charges of Rs 60 per hour. And if that’s a little scary, the shuttle services that connect the airport to different parts of the city might be a better option. There’s also an option of long term and short term parking at the airport.

So hope you folks are all geared up for the new BIAL airport!

For more information, go here: www.bengaluruairport.com

1 Comment so far

  1. masush on May 21st, 2008 @ 7:05 am

    Thanks for the article. A small observation – Link to the Bangalore Airport needs to be updated to: http://www.bialairport.com/

    Current link in the post (www.bengaluruairport.com) doesn’t work.



Terms of use | Privacy Policy | Content: Creative Commons | Site and Design © 2009 | Metroblogging ® and Metblogs ® are registered trademarks of Bode Media, Inc.